Paving will close I-64 East at HRBT overnight Oct. 19-21

Print
Email
|

by 13News

WVEC.com

Posted on October 5, 2012 at 5:42 PM

Updated Friday, Oct 5 at 6:01 PM

NORFOLK-VDOT is moving forward with paving at the Hampton Roads Bridge-Tunnel and hope that drivers won't face gridlock like they did last month.

I-64 East will be closed weekend nights October 19-22. Closures start at 9:00 p.m. and end at 9:00 a.m. on Friday and Saturday; the road will reopen Monday at 4:00 a.m.

The paving operation requires crews to mill and place new asphalt overlay in the left lane inside the eastbound tube. During the closure, traffic safety items will be replaced including pavement markings.

VDOT advises that eastbound drivers will be detoured to the I-664 Monitor-Merrimac Memorial Bridge-Tunnel during those hours. Officials say drivers using the M&M should expect up to a half-mile delay while the HRBT eastbound is closed.

Official note that no work will be done at the James River Bridge during these three days to help avoid backups at the M&M.

I-64 EAST CLOSURES:
Friday, Oct. 19, beginning at 9 p.m. until Saturday, Oct. 20, at 9 a.m.
Saturday, Oct. 20, beginning at 9 p.m. until Sunday, Oct. 21, at 9 a.m.
Sunday, Oct. 21, beginning at 9 p.m. until Monday, Oct. 22, at 4 a.m.

I-64 East DETOURS:
From I-64 east approaching I-664 south (Hampton Coliseum), motorists must stay on I-664 south through the MMMBT. Follow I-664 south to I-264 east towards the Downtown Tunnel. Follow I-264 east through the tunnel to the end of the detour at I-64 east and I-264 east (Barry Robinson Interchange).

For motorist staying on I-64 east towards the HRBT, they must exit at Mallory Street then head west on I-64 towards Williamsburg. Follow I-664 south towards the MMMBT to I-264 east towards the Downtown Tunnel. Follow I-264 east through the tunnel to the end of the detour at I-64 east and I-264 east (Barry Robinson Interchange).

Print
Email
|